July 27, 2005

Put up all the woodwork and the outlet covers, etc. Installed desk area

Stairway (wide)
Rack area
East wall
Desk area 1
Desk area 2
Common area 1
Common area 2

Next to do: Polyurethane on all wood

-------------------------------------------------------

July 4, 2005

Stained the wood:
- 1/2" Birch plywood
- Olympic Colonial Maple stain and nailed it up

Stairway (wide)
Rack area (wide)
Common area
Future desk area

Next to do:
- Sand and stain the beam
- Prep and nail up the trim
- Polyurethane on all wood

-------------------------------------------------------

June 29, 2005

Floor prepped:
- 3 colors of muriatic acid-based concrete stain
- 1 coat of sealant
- 4 coats of wax
Drywall primed

Floor Color
Stairway (wide)
Rack area (wide)
Common area
Future desk area

After painting...

Wall Texture 1
Wall Texture 2
Stairway (wide)
Rack area (wide)
Common area
Future desk area

Painted the ceiling, too, but no pics yet.

-------------------------------------------------------

June 13, 2005

Mud is up.
Clearing the clutter and cleaning the floor.
Prepping for the paint.

Next to do: Paint

-------------------------------------------------------

June 8, 2005

The drywall is all up and waiting for mud.
After mud, the floor will be painted.
After the floor is done, the woodwork will be done.
Pics next time.

-------------------------------------------------------

June 4, 2005

Mess.